Roof replacement cost

What a new roof costs in Richmond in 2026

For a typical Richmond-area house with architectural shingles, budget roughly $10,500 to $19,000. Here is how that number is built, and why the same-size house down the street might come in higher or lower.

Aerial view of a brick colonial roof half re-shingled, bundles on the ridge and a dumpster in the driveway

How roofers price a roof

Roofs are measured in squares: one square is 100 square feet of roof surface. A 2,000-square-foot two-story colonial in Chesterfield might have 22 to 28 squares of roof once you count the slopes, overhangs and porch; a 1,400-square-foot Henrico ranch might have 18 to 22. The per-square price covers tear-off, underlayment, shingles, labor and disposal. Then the extras go on their own lines.

Line on the estimateTypical rangeWhy it varies
Architectural shingles, installed, per square$450 – $700Shingle line, pitch, stories
Typical house, all in$10,500 – $19,00018–30 squares
Second layer of old shingles removed$50 – $100 / squareCommon on 1950s–80s houses
Decking sheets replaced$90 – $140 eachOnly where found soft
Steep-roof charge (8/12 and over)$40 – $120 / squareSafety setup, slower work
Chimney re-flashing$350 – $900Size, brick condition
Ventilation upgrade$300 – $1,200Ridge vent, intake vents
Impact-resistant (Class 4) shingles+$60 – $150 / squarePossible insurance credit
PermitIncludedPulled by us

2026 budgeting ranges for the Richmond area. Your estimate lists each line separately and is good for 30 days.

Six things that move the price

  1. Size. More squares, more material and labor. Porches and garages add squares people forget.
  2. Pitch. Steep roofs need more safety gear and go slower.
  3. Complexity. Every valley, dormer and wall intersection adds flashing and cutting time. Two houses of the same size can differ by thousands for this alone.
  4. Layers. Two old layers cost more to strip and haul than one.
  5. Decking. Old leaks leave soft wood that has to be replaced. We give a per-sheet price up front so there are no surprises.
  6. Material. Standard architectural shingles, heavier designer lines, impact-rated shingles and metal all price differently.

What should be included

When comparing estimates, check that each one includes: full tear-off to the deck; ice and water shield in valleys and at eaves; synthetic underlayment; new drip edge; new step and counter-flashing; new pipe boots; ventilation; disposal; magnetic nail sweep; and the permit. An estimate missing several of those is not cheaper, it is a smaller job.

Timing

Spring and fall are the busiest seasons. Late winter, on mild days, often has shorter waits. Shingles need some warmth to seal, so very cold stretches can delay the start by a few days.

Quick questions

How long does a replacement take?

One to two working days for most houses, longer for steep or complicated roofs, two layers of tear-off or a lot of decking.

Can I get a price without anyone on the roof?

A rough range from satellite measurements, yes. A real price needs a look at the deck, the flashing and the attic, which is what the free visit is for.

Is the cheapest estimate the best deal?

Only if it includes the same work. Compare line by line: tear-off, underlayment, flashing, boots, ventilation and permit.